welcome,guest

DIN Swivel Fitting

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2022-05-16 07:50

  • Browse the number:

    482

Send an inquiries

Company Profile

Yuyao Yide Fluid Power Co., Ltd

By certification [File Integrity]

Contact: yidefluid(Mr.)  

Email:

Telephone:

Phone:

Area: Zhejiang

Address: Zhejiang

Website: http://www.hydraulicfitting-china.com/ http://yidefluid.tek-corp.com/

New Products
Product details

Product Introduction

The main function of DIN swivel-to-swivel high pressure hydraulic tube fittings is the connection of 2 tubes or hoses with the same or different diameters. This broad range of fittings is available in steel with Cr(VI)-free surfaces and in stainless steel. DIN swivel to swivel high pressure hydraulic tube fittings have pressure ratings of up to 800 bar(S series) and 500 bar (L series), so that the fittings can be used in a wide range of applications.


Product Information

Place of Origin

Zhejiang, China

Brand Name

YIDE

Model Number

GZ, GZR

Type

Adapter, Tube Fitting

Material

Carbon Steel, Stainless Steel

Surface Treatment

Cr-(VI)-free Zinc plating

Zinc-nickel

Color

Silver

Pressure

High Pressure

Head Code

Hexagon

Shape

Straight, Elbow, Tee, Cross

Thread

24° DKO Swivel

Connection Type

Bite Type

MOQ

100PCS

Certification

ISO 9001, SGS, TUV

Specifications Met

DIN ISO 8434




Advantages

1. Own factory, products manufactured by ourselves.

2. Reasonable price

3. Customize service


Features

1. Positioned as manufacturer for OEM customer

2. Product quality meets market of middle and higher lever requirement.

3. Factory enterprise


Application

1. Industrial pipelines

2. Electric power gas

3. Coal mines

4. Aviation

5. Oil and gas

6. Transportation

7. Machine tools

8. Infrastructure

9. Defense


Supply Ability

500K Pieces per Month


Packaging & Delivery

Packaging Details: Plastic bags + corrugated Carton + wooden pallet with Iron belt or as per customer's request.

Port: Ningbo, Shanghai


Leadtime:

Quantity(Pieces)

1-5000 pieces

>5000 pieces

Estimated Time(Days)

25 days

negotiated


Delivery

According the goods scale, we can provide express, air shipping and sea shipping.

Trade Ability

Language Spoken

English

Total Annual Revenue

Confidential

Total Annual Export Revenue

Confidential

Export packaging

PP Bag + Corrugated Carton , Export Wood Box


Buyer Interaction

Response Rate

Response TIme

Quotation Offer

100%

Within 24h

Within 3 days


FAQ

1.Q: What's your delivery time?

A: The time of delivery is 25 days.


2.Q: What's the shipping port?

A: We ship the goods via Ningbo, Shanghai and the other main ports in China.


3.Q: What's your payment term?

A: Normally, our payment term is: 30% deposit advance the producing, 70% balance before delivery.


4.Q: Do you have products in stock?

A: Yes, we have quite complete series of stock.


5.Q: Can you produce Non standard product?

A: Yes, we can produce products per your requirements (according to your sample or drawing).


http://www.hydraulicfitting-china.com/